Wednesday, November 4, 2015

Going Up



Progress on the rack and pinion is in full force with trying to elevate the balls that are collected through the spinning collectors that direct the balls onto a platform that is attached to the rack and pinion.  Also just perfect calculations and the shooter fits in perfectly under the 18 inches height requirement. All that's left is to attached the platform to the rack and pinion and to attach the motors to the shooter and attach the shooter to the robot.