Today we put more supports on our elevator system so it is not wobbly and unstable.Also we are modifying our whole robot because it exceeded the 18 inch rule, We are changing a few pieces out for some smaller pieces that are just as effective, and follow the 18 inch rule.
Wednesday, November 18, 2015
The Shooter
Today we started to build the shooter in solid works, also we finished coding our PIC remote. We will be using PIC to control half of our robot, and vex for the other half. This makes for smoother operation, and less things for the driver to do at once.
Tuesday, November 17, 2015
The Backbone
Today we got up to speed with the solid works and robot. Now we are not behind, and everything we make on our robot we can immediately build on the solid works. Today we build the part on our robot to hold our brains, also we built this in solid works.
Monday, November 16, 2015
Finishing up
Today we got lots of tasks done. First we finished our launcher, then Nick started coding our launcher. We also attached our conveyor and elevator to one another and they tested moving the elevator up and down. Soon we will start attaching the launcher to the robot.
Friday, November 13, 2015
Thursday, November 12, 2015
No Days Off
Even though we had a day off yesterday we are back at it by attaching the elevator onto the rack and pinion. The elevator is the second to last piece that is left to attach to the robot, the last item is the shooter. Once we attach the elevator we can have a place to hold the balls and compete in the challenge of picking up four wiffle balls onto the robot. Hopefully by next week we have the elevator tested in the field and in mock scenarios.
Tuesday, November 10, 2015
School and Solidworks
This is a picture of a file of vex parts that comes with solidworks.